fbpx
< BACK TO NEWSROOM & EVENTS

Important Member Notice: Carpark Resurfacing from 7th January

We are excited to announce a significant upgrade to our main car park, commencing Tuesday, January 7th, 2025. The renovation will enhance accessibility and improve safety, ensuring a smoother experience for all visitors.

Project Overview

The car park resurfacing will be completed in four stages:

Stage 1: Repco Side (North Side)

  • 7th January: Preparation work.
  • 8th January: Asphalt surfacing.

Stage 2: Empire Furniture & Main Drive Side (South Side)

  • 9th January: Preparation work.
  • 10th January: Asphalt surfacing.

Temporary fencing will be installed to allow closures, and road closure and detour signs will direct traffic where required. At least two entrances will remain open at all times to minimize disruption:

  • Entrance 1: Empire Furniture Main Drive.
  • Entrance 2: Repco Side.
  • Entrance 3: Broad Meadows Street side (open throughout the project).

Final Touches: Line Marking

Approximately 14 days after the asphalt is laid, line marking will be completed:

  • 28th January: North Side (Repco).
  • 29th January: South Side (Empire Furniture & Main Drive).

What to Expect

Visitors are encouraged to plan for slight changes during this time, as sections of the car park will be closed temporarily. Detour signage will ensure traffic flow is maintained with minimal impact.

This upgrade reflects our ongoing commitment to improving your experience. Thank you for your patience as we work toward a safer, better car park.

LATEST NEWS & EVENTS

Exciting Updates to your Reformer Pilates Schedule – Starting Feb 3rd!

Read More

Australia Day Club and Class Hours

Read More

UPDATE: Our Pool & Recovery Area at Bibra Lake REOPENS Thursday, 16th January at 5am

Read More

Temporary Closure of Pool & Recovery Area at Bibra Lake

Read More